Study on Key Determinants for TQM Adoption in Construction Practices: An Indian Perspective

  • Anandakumar S Department of Civil Engineering, KPR institute of Engineering and Technology, Coimbatore, Tamil Nadu, India
Keywords: Dimensions, Statistical analysis, Implementation, Total Quality Management

Abstract

The purpose of this paper is to explore the factors that influence the implementation of TQM practices in the construction industry. The study was conducted in Tamil Nadu from June 2015 to January 2016. The researchers used a random sample approach to collect data from participants. A questionnaire-based approach was chosen to collect information from participants. Statistical tools such as Cronbach's Alpha, exploratory factor analysis, multiple regression, correlation, standard deviation, and coefficient variation were employed in the study. Nine crucial dimensions of TQM implementation were identified: customer-oriented factors, organizational culture factors, internal communication factors, supplier-related factors, employee participation factors, employee development factors, employee training factors, availability of equipment factors, and process improvement factors. TQM implementation is influenced by a number of factors, including but not limited to customer-oriented factors; organizational culture factors; employee participation factors; employee development factors; availability of equipment factors; and process improvement factors. The study found that TQM implementation is driven by customer-oriented factors. Among engineers and project managers, the focus on customer-oriented factors was the highest. The results of this study can be used to inform policy makers, helping them create effective TQM policies in the construction industry.

Downloads

Download data is not yet available.

Metrics

Metrics Loading ...

References

W. Lau, S. L. Tang, A survey on the advancement of QA (quality assurance) to TQM (total quality management) for construction contractors in Hong Kong. International Journal of Quality & Reliability Management, 26(5), (2009) 410-425. https://doi.org/10.1108/02656710910956166

M. Mosadeghrad, Why TQM programmes fail? A pathology approach. The TQM journal, 26(2), (2014) 160-187. https://doi.org/10.1108/TQM-12-2010-0041

Kenya Institute of Management (2009). Total Quality Management: Theory, Concepts and Practice. Macmillan Publishers

S. A. Brah, S. S. Tee, B. M. Rao, Relationship between TQM and performance of Singapore companies. International Journal of Quality & Reliability Management, 19(4), (2002) 356-379. https://doi.org/10.1108/02656710210421553

J. Hansson, H. Eriksson, The impact of TQM on financial performance. Measuring Business Excellence, 6(4), (2002) 44-54. https://doi.org/10.1108/13683040210451714

K. B. Hendricks, V. R. Singhal, Firm characteristics, total quality management, and financial performance. Journal of operations management, 19(3), (2001) 269-285. https://doi.org/10.1016/S0272-6963(00)00049-8

H. Kaynak, The relationship between total quality management practices and their effects on firm performance. Journal of operations management, 21(4), (2003) 405-435. https://doi.org/10.1016/S0272-6963(03)00004-4

M.M. Altayeb, M.B. Alhasanat, Implementing total quality management (TQM) in the Palestinian construction industry, International Journal of Quality & Reliability Management, 31(8), (2014) 878-887. https://doi.org/10.1108/IJQRM-05-2013-0085

A. Das, V. Kumar, U. Kumar, The role of leadership competencies for implementing TQM: An empirical study in Thai manufacturing industry. International Journal of Quality & Reliability Management, 28(2), (2011) 195-219. https://doi.org/10.1108/02656711111101755

R. Chapman, K. Al‐Khawaldeh, (2002), TQM and labour productivity in Jordanian industrial companies, The TQM Magazine, 14(4), 248-262. https://doi.org/10.1108/09544780210429861

N. Zakuan, S. Muniandy, M.Z.M. Saman, M.S.M. Ariff, S. Sulaiman, R.A. Jalil, Critical success factors of total quality management implementation in higher education institution: a review, International Journal of Academic Research in Business and Social Sciences, 2(12), (2012) 19-32.

B.W. Oruma, J.M.Mironga, B.O. Muma, Top Management Commitment Towards Implementation of Total Quality Management (TQM) in Construction Companies in Nakuru County-Kenya, International Journal of Economics, Finance and Management Sciences, 2 (2014), 332. https://doi.org/10.11648/j.ijefm.20140206.15

J. Motwani, Critical factors and performance measures of TQM. The TQM magazine, 13(4), (2001) 292-300. https://doi.org/10.1108/13683040010362300

K. Subrahmanya Bhat, J. Rajashekhar, (2009). An empirical study of barriers to TQM implementation in Indian industries. The TQM Journal, 21(3), 261-272. https://doi.org/10.1108/17542730910953031

Published
2023-12-13
How to Cite
(1)
S, A. Study on Key Determinants for TQM Adoption in Construction Practices: An Indian Perspective. ijceae 2023, 5, 1-17.
Section
Articles



Views: Abstract : 6 | PDF : 3

Plum Analytics